Custom Decks.

Custom-built outdoor living space designed around how you actually use your backyard — framed and fastened to handle Ohio freeze-thaw, snow load, and lakeside humidity.

Licensed & Insured Free Estimates 50-Mile Radius
Deck Building
Overview

Backyard Space
You'll Actually Use

A well-built deck turns unused yard into the part of your home you spend the most time in from May through October. We start by asking how you'll use it — grilling, entertaining, a hot tub, quiet mornings with coffee — and design around that instead of dropping a generic rectangle off the back door.

Structurally, everything gets built for this climate: proper footing depth below the frost line, correct joist spacing and span, hidden fasteners or coated screws that won't bleed rust, and flashing where the ledger meets the house so water never gets into your rim joist.

What's Included

Our Deck Services

Custom Deck Design

We lay out the deck around your yard, your house, and how you'll use the space — not a template.

Multi-Level Builds

Stepped platforms that work with sloped yards or separate grilling, dining, and lounging zones.

Railings & Stairs

Code-compliant railings in wood, composite, or cable, with stairs built to the right rise and run.

Deck Repair & Resurfacing

Solid frame but rough surface? We can replace decking and railings without rebuilding from scratch.

Built-In Features

Bench seating, planters, skirting, pergolas, and hidden storage built into the structure.

Footings & Framing

Frost-depth footings, properly spanned joists, and flashed ledger connections done to code.

Materials

Decking Options

Each material trades off cost, maintenance, and lifespan differently. Here's the honest breakdown.

01

Pressure-Treated Pine

The budget-friendly standard. Strong and readily available, but needs cleaning and re-sealing every couple of years to stay looking good.

02

Cedar

Naturally rot and insect resistant with a warm grain that takes stain beautifully. Softer underfoot than composite, still needs periodic sealing.

03

Composite Decking

Wood fiber and recycled plastic. No sealing, no staining, no splinters — just occasional washing. Higher upfront cost, lowest long-term maintenance.

04

PVC Decking

Fully synthetic and completely impervious to moisture. The best choice for ground-level decks, pool surrounds, or anywhere that stays damp.

Warning Signs

Is Your Deck Past Its Prime?

Decks fail gradually and then all at once. These are the signs worth acting on before someone gets hurt.

Soft or Spongy Boards

If a board flexes underfoot or you can push a screwdriver into it, rot has set in below the surface.

Wobbly Railings

Railings are a safety system. If they move when you lean on them, the posts or connections have failed.

Splintering & Cracking

Deep checking and splinters mean the wood has dried out past the point sealing will fix.

Rusted or Popped Fasteners

Nails backing out or rust streaks running down boards mean the fastening system is losing its grip.

Wobble in the Whole Structure

Any sway when you walk points to failing footings, posts, or a ledger that's pulling away from the house.

Rot Where It Meets the House

The ledger connection is the single most common deck failure point. Dark, soft wood there needs attention now.

How It Works

From Quote To Complete

The same straightforward process on every deck building project.

01

Reach Out

Call, text, or request a quote online. A rough description of what you need is plenty to start.

02

Free Estimate

We come out, look at the job in person, and give you a clear written quote. No pressure, no obligation.

03

We Get To Work

Once you approve the quote we schedule the job and show up when we said we would.

04

You Love It

We walk the finished work with you and don't wrap up until you're satisfied.

Questions

Deck FAQ

Usually yes, depending on height, size, and whether it attaches to the house. Requirements vary between Sandusky, Perkins Township, and the surrounding municipalities. We'll tell you what your specific project needs during the estimate.

Most straightforward decks take about one to two weeks from footings to final railing. Multi-level builds or projects with built-in features run longer. Weather and inspection scheduling can shift the timeline.

It depends how long you plan to stay. Composite costs more upfront but you'll never sand, stain, or seal it. Over ten-plus years the total cost usually evens out — and you get your weekends back.

Spring through fall is ideal, but we can pour footings and frame into late fall in most years. Booking in late winter usually gets you the best spot on the spring calendar.

Often, yes. If the framing and footings are sound, we can replace decking and railings for significantly less than a full rebuild. We'll assess the structure first and tell you honestly which makes more sense.

Let's Build

Ready To Build
Your Deck?

Free design consultation and estimate. Tell us how you want to use the space and we'll show you what's possible.